Finch Waste Landfill
Scope of Work:
- Mass excavation
- Low perm soil installation
- Geosynthetic (liner, GDC, GCL, cushion fabric) installation
- Leachate collection: stone and piping
- Gas collection piping
- Mechanical, electrical, and instrumentation for leak detection