OGS Emergency Sea Wall Repair
Scope of Work:
- Emergency response contractor to stabilize a 30-foot high concrete flood control wall. Several storms had damaged the wall and put it in a condition of catastrophic failure
- Construct temporary and permanent roads
- Turbidity curtains deployed and maintained to keep the creek free of contamination
- Underwater divers used to stabilize the foundation
- Entire projected completed in three months through the winter